009
Permits before you pour
05 MIN READ

Sequence before site
Permits are a construction document, not a delay. GreyForge tracks submissions, conditions and inspections as part of the build sequence so the site never outruns the paper.
What we log
Application date, authority, conditions, inspection windows. Replace this placeholder with your local process.