METHOD

DRAWING TO HANDOVER.

Six gates from first drawing to handover. Nothing starts until the previous gate is signed.

DRAWING

Survey, drawings, and a written scope before any material is ordered.

MATERIAL

Stone, timber, steel, and glass specified with lead times attached.

STRUCTURE

Frame, envelope, and inspections photographed at every hold point.

SPACE

Interiors, joinery, and finishes sequenced so trades do not collide.

COMPLETION

Punch, manuals, warranty, and a walkthrough you can keep.

Create a free website with Framer, the website builder loved by startups, designers and agencies.