METHOD
DRAWING TO HANDOVER.
Six gates from first drawing to handover. Nothing starts until the previous gate is signed.

DRAWING
Survey, drawings, and a written scope before any material is ordered.

MATERIAL
Stone, timber, steel, and glass specified with lead times attached.

STRUCTURE
Frame, envelope, and inspections photographed at every hold point.

SPACE
Interiors, joinery, and finishes sequenced so trades do not collide.

COMPLETION